City smoothes Jomtien Beach curve

Friday, 13 July 2012 From Issue Vol. XX No. 28 By  Sunturak Sangdokmai
  • 1 Comment

The Pattaya Engineering Department administered some first aid to the Jomtien Beach curve, leveling the pavement so it aligns correctly with sewage-drain covers.

A truckload of workers dug up the drain area July 6, poured new concrete and sunk the lid in so it was flush with the road’s surface. The repairs are hoped to reduce the risk of accidents on the busy street.

Workers from Pattaya’s Engineering Department repair the sunken drain in Jomtien. Workers from Pattaya’s Engineering Department repair the sunken drain in Jomtien.



1 Comment

Leave a comment

Make sure you enter the (*) required information where indicated.
Basic HTML code is allowed.

Please note: No obscenities, be polite, no personal attacks, and don't write using all capital letters. Comments not observing these basic rules will be deleted, unpublished.

Terms of Service | Privacy Policy | Advertise With Us | About Us | Feedback | Contact Us