City installing new drains on Jomtien Soi 5

Friday, 17 August 2012 From Issue Vol. XX No. 33 By  Sunturak Sangdokmai
  • Be the first to comment!

City engineers are laying drainage pipes and repairing potholes around Jomtien Soi 5 to create a smoother surface more impervious to flooding.

Workers dug up roadway and old pipes Aug. 1 on Soi 5, whose uneven surface and blocked drains resulted in constant flooding. Work on other roads near the Hanuman curve to Soi Chaiyapruek also left Soi 5 lower than other streets.

No time table was given as to when work is slated to be complete.

Jomtien Soi 5 is going to be a mess for a while as city workers replace the drains. Jomtien Soi 5 is going to be a mess for a while as city workers replace the drains.



Leave a comment

Make sure you enter the (*) required information where indicated.
Basic HTML code is allowed.

Please note: No obscenities, be polite, no personal attacks, and don't write using all capital letters. Comments not observing these basic rules will be deleted, unpublished.

Terms of Service | Privacy Policy | Advertise With Us | About Us | Feedback | Contact Us